undefined
+
  • undefined

Tunnel Special Machinery Manufacturing Project of Guangdong Xinlong Tunnel Equipment Co., Ltd.


This project is an all steel structure project: 1. Shield tunneling machine manufacturing, maintenance, and service center (factory building one), with a total construction area of 19,830.84 square meters and a building base area of 23,064.84 square meters. Natural foundation and pile foundation. Reinforced concrete foundation is made of steel structure. Building floors: 1 above ground level, with a total height of approximately 27.15 meters (eaves), a maximum span of 30 meters, and a maximum crane tonnage of 500 tons for the factory building. 2. The total construction area of the Shield Machine Inspection and Testing Center (including CNAS Laboratory) (Building 3) is 10,124.11 square meters. Building base area: 4,968.68 square meters. Natural foundation and pile foundation. Steel and reinforced concrete structures. Number of floors: The building has 2 floors and a total height of approximately 22.8 meters. First floor: 13.8 meters; Second floor: 9 meters.

 

Classification:

This project is an all steel structure project: 1. Shield tunneling machine manufacturing, maintenance, and service center (factory building one), with a total construction area of 19,830.84 square meters and a building base area of 23,064.84 square meters. Natural foundation and pile foundation. Reinforced concrete foundation is made of steel structure. Building floors: 1 above ground level, with a total height of approximately 27.15 meters (eaves), a maximum span of 30 meters, and a maximum crane tonnage of 500 tons for the factory building. 2. The total construction area of the Shield Machine Inspection and Testing Center (including CNAS Laboratory) (Building 3) is 10,124.11 square meters. Building base area: 4,968.68 square meters. Natural foundation and pile foundation. Steel and reinforced concrete structures. Number of floors: The building has 2 floors and a total height of approximately 22.8 meters. First floor: 13.8 meters; Second floor: 9 meters.

 

Key Words:

Tunnel Special Machinery Manufacturing Project of Guangdong Xinlong Tunnel Equipment Co., Ltd.

Previous: Shunde ALSO Plaza Landscape Renovation and Enhancement Project

Next: Dongfang Guanye's New Pipeline Network and New Material Manufacturing Factory Project - Steel Structure Engineering

Contact us to learn more about our business solutions

Fill out the form below to receive relevant news and industry insights delivered directly to your inbox

Submit Message