undefined
undefined
undefined
+
  • undefined
  • undefined
  • undefined

Dongfang Guanye's New Pipeline Network and New Material Manufacturing Factory Project - Steel Structure Engineering


This project will build an industrial park with a modern and minimalist style. Plan and design A1 high-rise sorting plant, A2 loading and unloading platform and winding path (below the winding path are equipment rooms and guard rooms), and A3 high-rise plant. The total construction area is 95,019.82 square meters, of which the A1 factory building has a construction area of 61,207.10 square meters, with 4 floors, a maximum span of 24 meters, and a floor height of 11 meters.

Classification:

This project will build an industrial park with a modern and minimalist style. Plan and design A1 high-rise sorting plant, A2 loading and unloading platform and winding path (below the winding path are equipment rooms and guard rooms), and A3 high-rise plant. The total construction area is 95,019.82 square meters, of which the A1 factory building has a construction area of 61,207.10 square meters, with 4 floors, a maximum span of 24 meters, and a floor height of 11 meters.

Key Words:

Dongfang Guanye's New Pipeline Network and New Material Manufacturing Factory Project - Steel Structure Engineering

Previous: Tunnel Special Machinery Manufacturing Project of Guangdong Xinlong Tunnel Equipment Co., Ltd.

Next: The First Phase of The New Energy and Agricultural Technology Project

Contact us to learn more about our business solutions

Fill out the form below to receive relevant news and industry insights delivered directly to your inbox

Submit Message