Type, characteristics and scope of application of prefabricated pipe gallery assembly?


Abstract

The prefabricated integrated pipe gallery has high construction efficiency and easy quality control, which can effectively shorten the on-site construction cycle and reduce the comprehensive construction cost.

The prefabricated integrated pipe gallery has high construction efficiency and easy quality control, which can effectively shorten the on-site construction cycle and reduce the comprehensive construction cost. In view of the four typical types of prefabricated integrated pipe gallery structure system in the current project (I. e. the whole cabin prefabricated integrated pipe gallery, the stacked plate assembly integrated pipe gallery, the prefabricated plate-type assembly integrated pipe gallery and the prefabricated groove-type assembly integrated pipe gallery), the structural characteristics and scope of application are introduced systematically. On this basis, the structural design method and engineering application of prefabricated integrated pipe gallery in China are combed, and the research and application of prefabricated integrated pipe gallery structure in China in the future are prospected.

01 Structural System

In view of the four common prefabricated integrated pipe gallery structure systems, the structural characteristics and scope of application are highlighted.

Prefabricated and assembled comprehensive pipe gallery for the whole cabin

The main feature of the whole cabin prefabricated and assembled utility tunnel is that the cross-sectional direction is prefabricated as a whole, and the longitudinal direction is divided into segments of a certain length (generally about 2m) according to the needs. The longitudinal connection of the prefabricated section of the prefabricated integrated pipe gallery for the whole cabin is generally constructed with prestressed tendons or bolts. Restricted by conditions such as transportation and hoisting, the prefabricated and assembled utility tunnel of the whole cabin is generally applicable to the utility tunnel with single cabin or double cabin and small cross-sectional size. The typical prefabricated and assembled utility tunnel structure of the whole cabin is shown in Figure 1.

Fig. 1 Prefabricated and assembled integrated pipe gallery for the whole cabin

Fig. 1 Integrated precast assembly utility tunnel

Composite plate assembled utility tunnel

The main feature of the composite plate assembly integrated pipe gallery is to divide the side wall, top plate and bottom plate into blocks. The side wall adopts double-sided composite structure, the top plate generally adopts composite floor structure, and the bottom plate generally adopts integral cast-in-place or composite structure. The typical composite plate assembly integrated pipe gallery is shown in Figure 2. At the construction site, the prefabricated blocks are connected by post-pouring laminated layers. In the longitudinal direction, the composite plate assembled utility tunnel is generally connected by post-pouring composite layer, and the longitudinal length of each prefabricated block is determined according to the transportation and hoisting conditions (generally 4~6m). Because the prefabricated blocks such as the bottom plate, side wall and top plate can be combined freely, the application range of the composite plate assembly integrated pipe gallery is wide, and it is the largest prefabricated assembly integrated pipe gallery structure system in China.

Fig. 2 Composite plate assembled utility tunnel

Fig. 2 Precast assembly utility tunnel composed of composite slabs

Prefabricated plate assembled utility tunnel

The structural characteristics of the prefabricated plate-type assembled integrated pipe gallery are similar to those of the laminated plate-type assembled integrated pipe gallery. The difference between the two is that the side walls, top plates and bottom plates of the prefabricated plate-type assembled integrated pipe gallery generally adopt the prefabricated solid plate-type structure. At the construction site, the side wall and the bottom plate can be connected by sleeve grouting or bolts, and the side wall and the top plate are generally connected by the core area of the post-pouring node or the post-pouring laminated layer, as shown in Figure 3. The prefabricated slab assembled utility tunnel is generally connected by post-pouring sections in the longitudinal direction, and the longitudinal length of each prefabricated block is determined according to the transportation and hoisting conditions (generally about 4m). The combination and assembly of the prefabricated blocks of the structural system are more flexible and have a wide range of applications.

Fig. 3 Prefabricated plate assembled utility tunnel

Fig. 3 Precast assembly utility tunnel composed of precast solid slabs

Prefabricated trough type assembled utility tunnel

The main feature of the prefabricated trough-type assembled utility tunnel is that it is divided into upper and lower two single-groove or multi-groove prefabricated blocks in the cross-sectional direction, and is connected at the construction site by means of prestressed tendons, bolts, sleeve grouting, etc. The prefabricated trough-type assembled utility tunnel is generally connected by prestressed tendons or bolts in the longitudinal direction. Limited by transportation and hoisting conditions, the longitudinal length of each prefabricated block of the prefabricated trough-type assembled utility tunnel is generally 2~3m, which is mainly applicable to the utility tunnel with ≤ 4 cabins. A typical 3-compartment prefabricated trough-type assembled utility tunnel is shown in Fig. 4.

Fig. 4 Prefabricated trough type assembled utility tunnel

Fig. 4 Precast assembly composed of precast groove-shape elements

02 Structural Design Method

The structural design method of prefabricated integrated pipe gallery has an important influence on its large-scale popularization and application. At present, China has not yet promulgated a technical standard specifically for the design of prefabricated integrated pipe gallery structure. However, the GB50838-2015 "Technical Specification for Urban Integrated Pipe Corridor Engineering" only makes preliminary provisions on the structural design of the whole cabin prefabricated and assembled integrated pipe gallery and single cabin prefabricated slot-type assembled integrated pipe gallery, and the main contents are as follows.

1. The cross-sectional internal force calculation model of the whole cabin prefabricated and assembled utility tunnel structure with only longitudinal joint joints should adopt the same closed frame model as the cast-in-place concrete utility tunnel structure.

2. The cross-sectional internal force calculation model of the single-cabin prefabricated groove-type assembly integrated pipe gallery with vertical and horizontal seam joints should consider the influence of the seam joint.

3. Prestressed tendon connection joints, bolt connection joints or socket joints shall be adopted for prefabricated and assembled utility tunnel structures.

4. Prefabricated and formed elastic sealing gasket shall be taken as the main waterproof measure for the waterproofing of prefabricated and assembled integrated pipe gallery. The interface stress of the elastic sealing gasket shall be ≥ 1.5MPa.

The above provisions provide a certain technical basis for the promotion and application of prefabricated integrated pipe gallery, but its content is relatively simple, and the key design parameters such as joint bending stiffness and joint shear carrying capacity need to be further clarified. In addition, the scope of application of the above provisions is limited, not yet included in the current engineering commonly used stacked plate assembled integrated pipe gallery, prefabricated plate assembled integrated pipe gallery and multi-cabin prefabricated slot assembled integrated pipe gallery.

At present, led by Tongji University and Shanghai Municipal Engineering Design and Research Institute (Group) Co., Ltd., and participated by China Railway Fourth Bureau Group Co., Ltd. and China State Construction Engineering Co., Ltd., the "Prefabricated and Assembled Comprehensive Pipe Gallery Structure Design Regulations" is under intense preparation. in. The promulgation and implementation of this standard will provide support for the large-scale promotion and application of prefabricated integrated pipe gallery structure.

03 Typical Engineering Applications

The comprehensive pipe gallery demonstration section of Shanghai World Expo Park (completed in 2007, 200m long) is the first comprehensive pipe gallery with prefabricated and assembled structure system in China. Since then, with the continuous development of the prefabricated integrated pipe gallery structure system and the construction of a large number of integrated pipe gallery projects, the prefabricated integrated pipe gallery has also made great progress in China. Several typical prefabricated and assembled utility tunnel projects are introduced as follows.

Prefabricated and assembled comprehensive pipe gallery for the whole cabin

The prefabricated section of the whole cabin prefabricated integrated pipe gallery has a large self-weight, which is limited by transportation and hoisting, and is mainly suitable for single-cabin and double-cabin integrated pipe gallery. Typical projects include Shanghai World Expo Park integrated pipe gallery project, Hubei Shiyan integrated pipe gallery project. Figure 5 shows the prefabricated and assembled integrated pipe gallery for single cabin and whole cabin in Shanghai World Expo Park, and Figure 6 shows the prefabricated and assembled integrated pipe gallery for double cabin and whole cabin in Shiyan, Hubei Province.

Fig. 5 Prefabricated and Assembled Integrated Pipe Gallery for Whole Cabin in Shanghai World Expo Park (Single Cabin)

  Fig. 5 Integrated precast concrete utility tunnelin Shanghai Expo area ( single compartment)

Fig. 6 Prefabricated and Assembled Integrated Pipe Gallery for Whole Cabin in Shiyan, Hubei (Double Cabin)

  Fig. 6 Integrated precast concrete utility tunnel in Shiyan ( double compartments)

Composite plate assembled utility tunnel

The stacked plate assembly integrated pipe gallery is currently the most widely used prefabricated assembly integrated pipe gallery in China. Typical projects such as Haikou Meian a longitudinal road double-cabin laminated plate assembled integrated pipe gallery. as shown in Figure 7.

Fig. 7 Haikou stacked plate assembled utility tunnel (double compartment)

Fig. 7 Precast concrete utility tunnel composed of composite slabs in Haikou ( double compartments)

Prefabricated plate assembled utility tunnel

The prefabricated plate-type assembled integrated pipe gallery greatly reduces the amount of on-site wet work on the basis of the laminated plate-type assembled integrated pipe gallery. However, the waterproof performance and safety of its connection seams need to be focused on. At present, there are few prefabricated plate assembled utility tunnel in practical application in the project, and a section of test section construction has been carried out in Zhongshan, Guangdong Province, as shown in Figure 8.

Fig. 8 Prefabricated Plate-type Assembled Utility Tunnel (Double Cabins) in Zhongshan, Guangdong

Fig. 8 Precast concrete utility tunnel composed of precast solid slabs in Zhongshan ( double compartments)

Prefabricated trough type assembled utility tunnel

Compared with the prefabricated integrated pipe gallery of the whole cabin, the prefabricated integrated pipe gallery can greatly reduce the weight of the prefabricated components, and at the same time significantly reduce the on-site wet operation and assembly workload, which has a good application prospect. Typical projects such as the integrated pipe gallery project in Liupanshui City, Guizhou Province. as shown in Figure 9.

Fig. 9 Prefabricated Trough-type Assembled Utility Tunnel (Double Cabins) in Liupanshui, Guizhou

Fig. 9 Precast concrete utility tunnel composed of groove-shape elements in Liupanshui ( double compartments)

04 Conclusion

Generally speaking, the research and application of prefabricated integrated pipe gallery in China started late, but under the guidance of national policy and the active participation of relevant units, phased results have been achieved. From the perspective of further scientific and technological innovation and popularization and application, the following work remains to be carried out.

1. For large cross-section, multi-cabin integrated pipe gallery, research and development of simple connection structure, fast construction speed, reliable quality of the new prefabricated integrated pipe gallery structure system.

2. For different prefabricated integrated pipe gallery structure systems, a comprehensive pipe gallery carrying capacity and deformation calculation model considering the influence of joints is established, and a systematic design method is proposed.

3. Considering the joint work of soil-structure, carry out the study on the seismic performance of the prefabricated integrated pipe gallery.

4. Further carry out the research on the waterproof measures for the joints of the prefabricated integrated pipe gallery, and improve the comprehensive waterproof performance of the prefabricated integrated pipe gallery.

RELATED INFORMATION


The 2022 "Xi Jiu Enters Famous Enterprises" Series of Activities Entering CHINESTAR Group

2022-10-14

A Gentleman's Quality Oriental Xi Jiu 2022 "Xi Jiu Enters Famous Enterprises" Series of Activities Entering CHINESTAR Group

Good News! The Construction Project Undertaken by CHINESTAR Won the Guangdong Province Construction Engineering Golden Craftsman Award and Quality Award

2022-09-01

Warm congratulations to the company for winning the Golden Craftsman Award and Quality Award! The achievement of the highest provincial award fully demonstrates CHINESTAR's excellent technological innovation ability and excellent engineering construction level, demonstrating the company's rich construction experience and strong construction strength in organizing, implementing, and ensuring major projects.

Xiaochen Is Here! The Group's Cartoon Image Has Been Officially Launched

2022-08-31

Faced with a new starting point and a new journey, CHINESTAR will carry on the past and seize opportunities, forge ahead with determination, and Xiaochen will work together with us to write a new chapter of high-quality development!