JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering


The third phase steel structure project of JD Asia No.1 Guangzhou Huadu Project is located south of Huadu, Guangzhou. The total construction area of the project is 144,614.99 square meters, consisting of four modern steel structure warehouses, C1~C4.

 

Main structure: The main cross-sectional form of the steel column is H600 * 250 * 6 * 12 cross column, and the main interface form of the steel beam is an H-shaped section steel beam, which is supported by a tie beam H450 * 230 * 6 * 10 and a circular pipe tie rod.

 

Maintenance structure: The roof adopts Z-shaped purlins + stainless steel wire mesh + 50mm thick insulation cotton + 476 type concealed buckle roof tiles, and the wall adopts Z-shaped purlins + 830 exposed nail wall panels. The top is equipped with a color band, and a full-length large canopy is installed in both directions of the longitudinal wall.

 

During the construction period, we encountered the rare heavy rainfall weather in Guangdong in 2022. The project department and team overcame the adverse effects caused by the weather, worked overtime, and delivered the work face to the general contractor on time and with quality, receiving unanimous praise from the owner and the general contractor.

 

Project : JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering

Project Manager: Xu Deliang                             Designer: Du Dongming

 

Pre Settlement Officer: Liang Jiangyan             Construction Worker: Huang Jin

Team: Tang Yongjun’s Team

 

Classification:

The third phase steel structure project of JD Asia No.1 Guangzhou Huadu Project is located south of Huadu, Guangzhou. The total construction area of the project is 144,614.99 square meters, consisting of four modern steel structure warehouses, C1~C4.

 

Main structure: The main cross-sectional form of the steel column is H600 * 250 * 6 * 12 cross column, and the main interface form of the steel beam is an H-shaped section steel beam, which is supported by a tie beam H450 * 230 * 6 * 10 and a circular pipe tie rod.

 

Maintenance structure: The roof adopts Z-shaped purlins + stainless steel wire mesh + 50mm thick insulation cotton + 476 type concealed buckle roof tiles, and the wall adopts Z-shaped purlins + 830 exposed nail wall panels. The top is equipped with a color band, and a full-length large canopy is installed in both directions of the longitudinal wall.

 

During the construction period, we encountered the rare heavy rainfall weather in Guangdong in 2022. The project department and team overcame the adverse effects caused by the weather, worked overtime, and delivered the work face to the general contractor on time and with quality, receiving unanimous praise from the owner and the general contractor.

 

Project : JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering

Project Manager: Xu Deliang                             Designer: Du Dongming

 

Pre Settlement Officer: Liang Jiangyan             Construction Worker: Huang Jin

Team: Tang Yongjun’s Team

 

Key Words:

JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering

Previous: Construction of Guangduan Forging High Intelligent Equipment Heavy-Duty Workshop

Next: Phase II Project of The Dock in The Local Port Operation Area of Liaogeshan Port District, Foshan City (Zone A)

Contact us to learn more about our business solutions

Fill out the form below to receive relevant news and industry insights delivered directly to your inbox

Submit Message