JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering
The third phase steel structure project of JD Asia No.1 Guangzhou Huadu Project is located south of Huadu, Guangzhou. The total construction area of the project is 144,614.99 square meters, consisting of four modern steel structure warehouses, C1~C4.
Main structure: The main cross-sectional form of the steel column is H600 * 250 * 6 * 12 cross column, and the main interface form of the steel beam is an H-shaped section steel beam, which is supported by a tie beam H450 * 230 * 6 * 10 and a circular pipe tie rod.
Maintenance structure: The roof adopts Z-shaped purlins + stainless steel wire mesh + 50mm thick insulation cotton + 476 type concealed buckle roof tiles, and the wall adopts Z-shaped purlins + 830 exposed nail wall panels. The top is equipped with a color band, and a full-length large canopy is installed in both directions of the longitudinal wall.
During the construction period, we encountered the rare heavy rainfall weather in Guangdong in 2022. The project department and team overcame the adverse effects caused by the weather, worked overtime, and delivered the work face to the general contractor on time and with quality, receiving unanimous praise from the owner and the general contractor.
Project : JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering
Project Manager: Xu Deliang Designer: Du Dongming
Pre Settlement Officer: Liang Jiangyan Construction Worker: Huang Jin
Team: Tang Yongjun’s Team
Classification:
The third phase steel structure project of JD Asia No.1 Guangzhou Huadu Project is located south of Huadu, Guangzhou. The total construction area of the project is 144,614.99 square meters, consisting of four modern steel structure warehouses, C1~C4.
Main structure: The main cross-sectional form of the steel column is H600 * 250 * 6 * 12 cross column, and the main interface form of the steel beam is an H-shaped section steel beam, which is supported by a tie beam H450 * 230 * 6 * 10 and a circular pipe tie rod.
Maintenance structure: The roof adopts Z-shaped purlins + stainless steel wire mesh + 50mm thick insulation cotton + 476 type concealed buckle roof tiles, and the wall adopts Z-shaped purlins + 830 exposed nail wall panels. The top is equipped with a color band, and a full-length large canopy is installed in both directions of the longitudinal wall.
During the construction period, we encountered the rare heavy rainfall weather in Guangdong in 2022. The project department and team overcame the adverse effects caused by the weather, worked overtime, and delivered the work face to the general contractor on time and with quality, receiving unanimous praise from the owner and the general contractor.
Project : JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering
Project Manager: Xu Deliang Designer: Du Dongming
Pre Settlement Officer: Liang Jiangyan Construction Worker: Huang Jin
Team: Tang Yongjun’s Team
Key Words:
JD Asia No.1 Guangzhou Huadu Project Phase III Steel Structure Engineering
Previous: Construction of Guangduan Forging High Intelligent Equipment Heavy-Duty Workshop
Service Items
More Engineering
Contact us to learn more about our business solutions
Fill out the form below to receive relevant news and industry insights delivered directly to your inbox
Address: 14th Floor, Nature Home Building, No.1 Zhicheng Road, Daliang Street, Shunde District, Foshan City, Guangdong Province, China
Telephone: 86-757-22236808/22615959
Customer service hotline: 86-400-6683686
E-mail:fszcgg@126.com
WeChat Public Number
Sweep to learn more