Lin's Wood Industry Intelligent Dispatch Center (South China) Project Phase I Project
The first phase of the Lin's Wood Industry Intelligent Dispatch Center (South China) project is the first time that Lin's Wood Industry Group has built a logistics and warehousing park in the South China region, covering a total area of 250,000 square meters. This project is located in Huangji Village, Jiujiang Town, Nanhai District, Foshan City. It mainly adopts a portal light steel frame structure, with a single layer steel structure as the main body. The production and installation of all components of the building system, such as wall and roof systems (including insulation cotton), daylighting panels, and canopies, are carried out, and the roof adopts siphon drainage. The first phase has a construction area of 73,561.53 square meters, a maximum span of 24 meters, and a building height of 15.5 meters.
The project started construction on July 16, 2017 and was completed in October 2017, lasting for 99 days. Due to the tight schedule, many construction processes were not completed in the early stage of the steel structure main construction, resulting in multiple simultaneous construction processes and construction units in the later stage. A series of simultaneous construction work scenes, including pile foundation, earthwork backfilling, concrete embedding and pouring, steel structure main lifting and maintenance installation, fire pipes, water and drainage, water and electricity installation, ground concrete pouring, and shelf installation, have brought great construction difficulties to our steel structure installation, especially the secondary transportation of materials and the delivery and use of construction work surfaces. In order to deliver the project to Party A for use as soon as possible according to the contract schedule, each process should be completed in advance, and aluminum windows and sliding doors should be installed simultaneously during the installation of steel structure wall panels. During the construction process, there were continuous high temperatures and the adverse weather effects of four typhoons. Every day, workers suffered from mild heatstroke. The project department took a series of measures such as taking turns to rest, heatstroke prevention, and cooling to ensure the installation progress. Before the arrival of each typhoon, all installation workers withdrew from the site to nearby hotels for accommodation and other unfavorable conditions. With the joint efforts of the company and project department, the contract period was completed on time and with quality, and no safety or quality accidents occurred during the construction process. Therefore, it received high praise and recognition from the civil engineering party and the owner. The owner also entrusted the 120,000 square meter steel structure project of Phase II Project No.1 Warehouse to CHINESTAR for construction.
Project: Lin's Wood Industry Intelligent Dispatch Center (South China) Project Phase I Project
Project Manager: Fan Chubu Designer: Yang Chunqiang
Pre Settlement Officer: Chen Liren Construction Supervisor: Cheng Fangde
Quality and Safety Officer: Chen Qiji Team: Liu Jianhua and Mo Bingrong’s Team
Classification:
The first phase of the Lin's Wood Industry Intelligent Dispatch Center (South China) project is the first time that Lin's Wood Industry Group has built a logistics and warehousing park in the South China region, covering a total area of 250,000 square meters. This project is located in Huangji Village, Jiujiang Town, Nanhai District, Foshan City. It mainly adopts a portal light steel frame structure, with a single layer steel structure as the main body. The production and installation of all components of the building system, such as wall and roof systems (including insulation cotton), daylighting panels, and canopies, are carried out, and the roof adopts siphon drainage. The first phase has a construction area of 73,561.53 square meters, a maximum span of 24 meters, and a building height of 15.5 meters.
The project started construction on July 16, 2017 and was completed in October 2017, lasting for 99 days. Due to the tight schedule, many construction processes were not completed in the early stage of the steel structure main construction, resulting in multiple simultaneous construction processes and construction units in the later stage. A series of simultaneous construction work scenes, including pile foundation, earthwork backfilling, concrete embedding and pouring, steel structure main lifting and maintenance installation, fire pipes, water and drainage, water and electricity installation, ground concrete pouring, and shelf installation, have brought great construction difficulties to our steel structure installation, especially the secondary transportation of materials and the delivery and use of construction work surfaces. In order to deliver the project to Party A for use as soon as possible according to the contract schedule, each process should be completed in advance, and aluminum windows and sliding doors should be installed simultaneously during the installation of steel structure wall panels. During the construction process, there were continuous high temperatures and the adverse weather effects of four typhoons. Every day, workers suffered from mild heatstroke. The project department took a series of measures such as taking turns to rest, heatstroke prevention, and cooling to ensure the installation progress. Before the arrival of each typhoon, all installation workers withdrew from the site to nearby hotels for accommodation and other unfavorable conditions. With the joint efforts of the company and project department, the contract period was completed on time and with quality, and no safety or quality accidents occurred during the construction process. Therefore, it received high praise and recognition from the civil engineering party and the owner. The owner also entrusted the 120,000 square meter steel structure project of Phase II Project No.1 Warehouse to CHINESTAR for construction.
Project: Lin's Wood Industry Intelligent Dispatch Center (South China) Project Phase I Project
Project Manager: Fan Chubu Designer: Yang Chunqiang
Pre Settlement Officer: Chen Liren Construction Supervisor: Cheng Fangde
Quality and Safety Officer: Chen Qiji Team: Liu Jianhua and Mo Bingrong’s Team
Key Words:
Lin's Wood Industry Intelligent Dispatch Center (South China) Project Phase I Project
Previous: Zhongshan Base of Guangdong Yuexin Ocean Engineering Co., Ltd.
Next: Changying Hainan Eco Cultural Industrial Park German Park
Service Items
More Engineering
Contact us to learn more about our business solutions
Fill out the form below to receive relevant news and industry insights delivered directly to your inbox
Address: 14th Floor, Nature Home Building, No.1 Zhicheng Road, Daliang Street, Shunde District, Foshan City, Guangdong Province, China
Telephone: 86-757-22236808/22615959
Customer service hotline: 86-400-6683686
E-mail:fszcgg@126.com
WeChat Public Number
Sweep to learn more