Steel Structure Project of Building A of Haikou Harmonious Home Commercial and Residential Building
The steel structure project is located at No. 47 Wuzhishan Road, Haikou City. The construction area of this project is 59,055 square meters, including 53,100.56 square meters above ground and 5,954.44 square meters underground. The total height of the engineering building is 94.68 meters. The basement of this project is integrated and divided into three units above ground. The above ground structure of Unit 1 is an independent tower, while Units 2 and 3 have 1-3 floors integrated with the podium. Units 4 and above are divided into 2 towers.
This project is an prefabricated steel structure, with columns and beams made of prefabricated steel components. The floor slab is a reinforced truss type floor support plate, and the steel structure assembly rate reaches 50%.
The above ground area of Unit 1 is 18,205.74 square meters, with a total of 27 floors. The underground level is 6 meters high for civil defense, the above ground level is an elevated level with a height of 5.85 meters, and the 2-27 floors above ground are towers with a height of 3.00-4.89 meters; The above ground construction area of the second and third units is 34,894.82 square meters; The total number of floors in the building is 26, including 1 underground floor with a height of 6 meters. The 1-3 above ground podium buildings are commercial with a height of 6.00 meters/4.5 meters, and the 4-26 above ground floors with a height of 3-4.89 meters.
This project is located in the bustling urban area of Meilan District, Haikou City. The construction site is narrow, and there are time restrictions on material deliveries and vehicle access. Besides, there are commercial and residential buildings and military courtyards in the surrounding area, and the working hours are very limited. From 7:00 am to 12:00 am and from 2:30 pm to 10:00 pm, the project department and team overcame many difficulties, raised personnel and mechanical equipment, actively cooperated with the owner's construction schedule requirements, and worked overtime during this limited time. The company also actively cooperated and coordinated the supply of materials, truly reflecting the service concept of "CHINESTAR Steel Structure, Building CHINESTAR".
Today, with the increasing development of green buildings, people are paying more and more attention to methods to achieve building greening. In line with the development trend of green, ecological, healthy, and comfortable building materials, leading the way in building energy conservation, green building materials, energy-saving, material saving, and water-saving equipment, prefabricated buildings are the latest frontier in the development of green building technology. Prefabricated buildings are a typical representative of green buildings, and their main advantages include improving quality, improving efficiency, and reducing labor. Prefabricated construction, as an emerging industry actively promoted by the country, will lead the future development direction of the construction industry.
Project : Steel Structure Project of Building A of Haikou Harmonious Home Commercial and Residential Building
Project Manager: Yu Yue Designer: Cheng Rongqin
Pre Settlement Officer: Cui Zhusheng Quality and Safety Officer: Chen Xiangchao
Construction Worker: Li Lirong Team: Chen Xiangchao’s Team
Classification:
The steel structure project is located at No. 47 Wuzhishan Road, Haikou City. The construction area of this project is 59,055 square meters, including 53,100.56 square meters above ground and 5,954.44 square meters underground. The total height of the engineering building is 94.68 meters. The basement of this project is integrated and divided into three units above ground. The above ground structure of Unit 1 is an independent tower, while Units 2 and 3 have 1-3 floors integrated with the podium. Units 4 and above are divided into 2 towers.
This project is an prefabricated steel structure, with columns and beams made of prefabricated steel components. The floor slab is a reinforced truss type floor support plate, and the steel structure assembly rate reaches 50%.
The above ground area of Unit 1 is 18,205.74 square meters, with a total of 27 floors. The underground level is 6 meters high for civil defense, the above ground level is an elevated level with a height of 5.85 meters, and the 2-27 floors above ground are towers with a height of 3.00-4.89 meters; The above ground construction area of the second and third units is 34,894.82 square meters; The total number of floors in the building is 26, including 1 underground floor with a height of 6 meters. The 1-3 above ground podium buildings are commercial with a height of 6.00 meters/4.5 meters, and the 4-26 above ground floors with a height of 3-4.89 meters.
This project is located in the bustling urban area of Meilan District, Haikou City. The construction site is narrow, and there are time restrictions on material deliveries and vehicle access. Besides, there are commercial and residential buildings and military courtyards in the surrounding area, and the working hours are very limited. From 7:00 am to 12:00 am and from 2:30 pm to 10:00 pm, the project department and team overcame many difficulties, raised personnel and mechanical equipment, actively cooperated with the owner's construction schedule requirements, and worked overtime during this limited time. The company also actively cooperated and coordinated the supply of materials, truly reflecting the service concept of "CHINESTAR Steel Structure, Building CHINESTAR".
Today, with the increasing development of green buildings, people are paying more and more attention to methods to achieve building greening. In line with the development trend of green, ecological, healthy, and comfortable building materials, leading the way in building energy conservation, green building materials, energy-saving, material saving, and water-saving equipment, prefabricated buildings are the latest frontier in the development of green building technology. Prefabricated buildings are a typical representative of green buildings, and their main advantages include improving quality, improving efficiency, and reducing labor. Prefabricated construction, as an emerging industry actively promoted by the country, will lead the future development direction of the construction industry.
Project : Steel Structure Project of Building A of Haikou Harmonious Home Commercial and Residential Building
Project Manager: Yu Yue Designer: Cheng Rongqin
Pre Settlement Officer: Cui Zhusheng Quality and Safety Officer: Chen Xiangchao
Construction Worker: Li Lirong Team: Chen Xiangchao’s Team
Key Words:
Steel Structure Project of Building A of Haikou Harmonious Home Commercial and Residential Building
Next: Guangdong Yunfu (Luoding) Agricultural Products Trading Expo Center
Service Items
More Engineering
Contact us to learn more about our business solutions
Fill out the form below to receive relevant news and industry insights delivered directly to your inbox
Address: 14th Floor, Nature Home Building, No.1 Zhicheng Road, Daliang Street, Shunde District, Foshan City, Guangdong Province, China
Telephone: 86-757-22236808/22615959
Customer service hotline: 86-400-6683686
E-mail:fszcgg@126.com
WeChat Public Number
Sweep to learn more